42/13a-A12 (A2ST) (Breagh Alpha)
A further development well in the Southern North Sea Breagh field with the gas reservoir in the Lower Carboniferous sandstones of the Yoredale Group, Zone 1A. The well was successfully Geosteered using the SLB PeriScope tool and logged with LWD in Q2 2023 using the Noble Resilient jack-up drilling rig. The well was then completed and performated for production.
2023 as Consultant Wellsite Geologist for DXC Geological Ltd.
42/13a-A11 (SE) (Breagh Alpha)
A long step out, high inclination phase 3 development well in the Southern North Sea Breagh field with the gas reservoir in the Lower Carboniferous sandstones of the Yoredale Group, Zone 1B. The well was successfully drilled and logged with LWD in Q3 2021 using the Maersk Resolve jack-up drilling rig. The well was then completed, perforated and stimulated using hydraulic fracturing.
2021 as Consultant Wellsite Geologist for DXC Geological Ltd.
42/13a-A4Z (A4ST) (Breagh Alpha)
An 'S-shaped' phase 2 development well in the Southern North Sea Breagh field with the gas reservoir in the Lower Carboniferous sandstones of the Yoredale Group, Zone 1A. Following abandonment of well A4 a window was milled in the 9-5/8" casing and the well successfully drilled and logged with LWD in Q1 2018 using the Ensco 121 jack-up drilling rig. The open hole reservoir interval was logged and formation pressures obtained using wireline logging tools prior to the well being completed and well tested.
2018 as Consultant Wellsite Geologist for DXC Geological Ltd.
_____________________________________________
42/13a-A10Z (AP) (Breagh Alpha)
An 'S-shaped' phase 2 development well in the Southern North Sea Breagh field with the gas reservoir in the Lower Carboniferous sandstones of the Yoredale Group, Zone 1B. Following kicking off from a cement plug below the 13-3/8" casing shoe the well was successfully drilled and logged with LWD in Q4 2017 using the Ensco 121 jack-up drilling rig. The open hole reservoir section was logged and formation pressures obtained using wireline logging tools prior to the well being completed, perforated and stimulated using hydraulic fracturing.
42/13a-A10 (AD) (Breagh Alpha)
An 'S-shaped' phase 2 development well in the Southern North Sea Breagh field with the gas reservoir in the Lower Carboniferous sandstones of the Yoredale Group, Zone's 1 through to 4. The well was successfully drilled and logged with LWD and wireline in Q4 2017 using the Ensco 121 jack-up drilling rig.
42/13a-A9, 42/13a-A9Z (AM) (Breagh Alpha)
An 'S-shaped' phase 2 development well in the Southern North Sea Breagh field with the gas reservoir in the Lower Carboniferous sandstones of the Yoredale Group, Zone 1A (Upper). Following a mechanical sidetrack from a 9-5/8" casing window the well was successfully drilled and logged with LWD in Q3 2017 using the Ensco 121 jack-up drilling rig. The open hole reservoir section was logged and formation pressures obtained using wireline logging tools prior to the well being completed, perforated and stimulated using hydraulic fracturing.
2017 as Wellsite Geologist for Barrel Consultants Ltd.